This stacked townhouse project in Waterloo features 76 apartments in five blocks. The townhouse blocks include one and two-bedroom units over three storeys. The buildings were designed to provide a contemporary feel and use a mixture of classical materials with modern textures to provide lively facades that aim to bring vibrancy to the neighborhood.
The Grand Opening took place on 8th August 2025, with Ian Cook, the Owner of Cook Homes, City of Waterloo Mayor Dorothy McCabe and Ward Councillor Hans Roach present to cut the ribbon. Residents have moved into units in Block C, D and E, with the build-out of the site expected in January 2026.

